top of page
SEER2%20Logo-superimposed%20leaves_edited.png
strip-1a.png

WFM Quarry Air20 DOAS
DHP-40

Controls Change Notification 

  • These Air2O units have been converted from the ALC OEM Controls to CPC controls.

  • These units can be accessed through the Building Controller.

  • Any reference to the OEM controller in the IOM and Control Wiring plans to be ignored.

  • For Controls Support please contact the SEER2 Technical Call Center at Controls@seer2.net, or call us at (855) 688-6063. We can be reached Monday-Friday, from 8AM-8PM EST.

IOM Manual - DHP-40

Wiring Diagram -  DHP-40

CPC Board Schedule – DHP 40

If you are in need of Emergency Support, please contact the SEER2 Technical Call Center at Controls@seer2.net, or call us at (855) 688-6063. We can be reached Monday-Friday, from 8AM-8PM EST.

strip-2a.png

CONTACT US

© 2023 by Sphere Construction. Proudly created with Wix.com

SEER2%20Logo-superimposed%20leaves_edite
1.855.688.6063

Phoenix  |  Denver  |  Greensboro  |  Fort Myers  | Kansas City

Thank you for contacting us. We will reply soon.

© 2020 by SEER2. All rights reserved  |  Privacy Policy  |  Accessibility Statement

bottom of page